Fujimi hut report(2)
Fujimi hut report (2) 伐採、抜根、根切りを終え道路からのアクセスと基礎底に砕石しました。8月は3週間工事禁止なので施工図確認期間とします。今回地質調査はしてません。凍結震度1メートルなので1メート掘っています。掘った土の重さと、建物重さが釣り合うという理屈です。
Fujimi hut report (2) After removing the trees, roots, the access from the road and crushed stones were put on the foundation bottom. In August, construction is prohibited for 3 weeks, so it will be a construction drawing confirmation period. We didn’t do a geological survey this time. Since the freezing seismic intensity is 1 meter, we are digging 1 meter. The theory is that the weight of the excavated soil and the weight of the building are balanced.